Using Earned Value Management for More Sustainable Project Schedule Control

Authors

DOI:

https://doi.org/10.7595/management.fon.2022.0011

Keywords:

earned value, project duration forecasting, earned schedule, earned duration

Abstract

Research Question: The aim of this paper is to provide a state-of-science review and offer a critical analysis of contemporary schedule related Earned Value Management (EVM) approaches. Motivation: Since the introduction of the EVM as a tool for project control in the late 1960s, academics have tried to improve its best application. Although this method significantly contributed to efficient cost management, application of EVM to schedule management was falling behind. A significant effort has been made to improve its usability for project time management, which resulted in a dramatic evolution. The paper builds on existing literature and earlier studies, adding value with the inclusion of the cost-based and time-based approaches for assessing project schedule performance. Idea: The idea of this paper was to evaluate some of the most significant EVM schedule control methods and identify open issues. The main study hypothesis is that the most recent approaches provide a more reliable forecast and thus a solid ground for further improvements. Data: A case study in the form of a simplified project was used to illustrate how different contemporary approaches compare in terms of conceptualization, methodological issues, and theoretical underpinnings. Tools: A combination of statistical analysis and Monte Carlo simulation was used to evaluate the performance of different EVM approaches. Microsoft Excel was used for data processing, Microsoft Project and SATA software for data visualization, and Oracle Crystal Ball for Monte Carlo simulation. Findings: Quantitative analysis confirmed that the project-specific Earned Duration Management (EDM) and Earned Schedule (ES) approaches provide sustainable and more accurate results during the whole projects lifespan, while forecasts obtained by more traditional methods proved to be unreliable in the later stages of the project. While practical application generally lags after the growing theory, the latest literature paves the way to the integration of EVM and risk management making the contemporary EVM approaches stochastic and therefore more realistic. Contribution: The results of this study can be used as a basis for introducing advanced and generally more usable EVM models, which will improve the project schedule control.

Author Biography

Goran Avlijaš, Singidunum University, Belgrade, Serbia

Goran Avlijaš holds the position of associate professor at the Singidunum University, where he teaches Project Management and Entrepreneurship courses. He has obtained his Bachelor’s and Master’s degrees from the Faculty of Organizational Sciences, and earned his PhD degree from the Singidunum University. He has worked in the distribution sector, project management and management consulting in several multinational companies. He is also a certified Project Management Professional (PMP), the author of two textbooks and numerous scientific papers, as well as a visiting lecturer within the Erasmus+ mobility programme.

Downloads

Published

2024-09-05

How to Cite

Avlijaš, G. (2024). Using Earned Value Management for More Sustainable Project Schedule Control. Management:Journal of Sustainable Business and Management Solutions in Emerging Economies, 29(2), 1–12. https://doi.org/10.7595/management.fon.2022.0011

Issue

Section

Articles

Similar Articles

<< < 5 6 7 8 9 10 11 > >> 

You may also start an advanced similarity search for this article.